What a RAG supplier must hand over so your team can maintain the system
Ask for assets your team can run without the supplier: the source connectors and sync jobs, every setting that shapes retrieval, the evaluation set with the harness and baseline results, and runbooks for the situations that will certainly occur. Then have your own engineers rehearse the critical tasks before final sign-off. Documents and slide decks describing the system are useful, and they do not replace any of these.
Why a RAG handover involves more than code
A RAG system behaves according to its sources, its configuration and the models it calls, as much as its code. Sources change, permissions shift, and model versions are retired by their providers. The 2015 paper on hidden technical debt in machine learning systems named data dependencies, configuration and changes in the external world among the reasons such systems are expensive to maintain. A handover that transfers a repository and a diagram leaves those risks with whoever happens to be on call.
The handover inventory
Sources and sync
- Connector code and schedules for every source, running in your accounts
- How each source handles edits, deletions, moves and permission changes, with the measured delay
- The owner of each source and the credentials model, with secrets in your vault rather than in the repository
Retrieval configuration
- Chunking rules, embedding model and version, analyzers, number of retrieved chunks, reranker and prompts, all under version control
- A script that rebuilds the index from an empty state
- Platform settings whose timing matters, such as a deletion policy: some platforms let you add one later, but records deleted before it existed may stay in the index until you reconcile or rebuild it
Evaluation assets
- Test questions with expected passages and answers, including questions to decline and permission cases
- The harness that scores retrieval and answers separately, and the baseline results with the exact configuration that produced them
Operations
- Dashboards for latency, cost per request, sync status and failed items, owned by your team
- Alert rules and where alerts are routed
- A record of who may change prompts, retrieval settings and source scope, and how such changes are reviewed
Situations the runbook must cover
- 1
A user reports a wrong answer
Find the trace, check whether the evidence was indexed, retrieved and passed to the model, and add the case to the test set.
- 2
A document must disappear today
Remove it at the source, force the sync or delete it from the index directly, and confirm with a query that it no longer answers.
- 3
A new source is added
Inventory entry, owner, permissions mapping, connector, test questions for the new content, evaluation run.
- 4
A model is retired or replaced
A new embedding model means rebuilding the index; a new answer model means a full evaluation run against the baseline before switching.
- 5
A sync job fails
Alerts, how to rerun safely, and how to tell which content is now stale.
Rehearse before you sign
A handover is complete when your team has done the critical tasks once without the supplier doing them. Run a rehearsal in staging in which your engineers act and the supplier only answers questions. The checklist below is an example to adapt; the agreed score range should come from the baseline, because model-based scores vary between runs.
Handover rehearsal (run by the client team, supplier observes only)
[ ] Rebuild the index from scratch in staging from the repository and runbook
[ ] Run the evaluation set; scores fall within the agreed range of the baseline
[ ] Add one new test source end to end, including owner and permissions
[ ] Remove one document and show with a canary that it no longer answers
[ ] Diagnose a planted wrong answer from its trace and name the failing stage
[ ] Rotate one connector credential without a code change
[ ] Run a recovery drill: simulate a failed sync or a bad configuration
change in staging, detect it from alerts and restore service
[ ] Find the cost per request and latency for yesterday on the dashboard
Each item: who ran it, date, result, link to evidenceItems that fail show where knowledge still sits with the supplier. That is more useful than any number of handover meetings, and it gives both sides a clear end point that does not depend on the calendar.
Owners after go-live
Name a person for each of these before launch: answer quality and the test set, each source's content, the sync and index platform, the periodic review of permissions, and the on-call response when the assistant misbehaves. Microsoft's RAG guidance makes the point that evaluation is not a one-time activity, because documents and user questions change, and that keeping the record of past evaluations matters for future work. Someone has to own that record.
If you are about to start a RAG project with an external team, put the handover inventory and the rehearsal into the scope at the beginning, and have repositories, cloud accounts and dashboards live in your organisation from the first day. Contract wording is for your procurement and legal advisers; the engineering deliverables above give them something concrete to write down.
Questions
Can a system built on a managed platform be handed over properly?
Yes, if the platform runs in your own account and its configuration is exported as code or at least documented setting by setting. Check which settings are hard to change once content is indexed, and whether evaluation results can be reproduced outside the platform.
How long should the supplier stay involved after handover?
Base it on the rehearsal rather than a date. Once your team has passed every item, including a recovery drill that simulates an incident in staging, remaining support can be on request. If items keep failing, the handover is not finished, whatever the plan says.
More from the blog
Retrieval or generation?
A diagnostic procedure for finding out whether a wrong RAG answer started in ingestion, search, reranking or the model, using labelled evidence and per-question traces.
Stale documents in RAG
How to keep a retrieval assistant current when documents are edited, renamed, restricted or deleted, with a sync design and canary tests that prove old content is gone.
RAG document permissions
How access rules travel from source systems into a retrieval index, where they get lost, and which negative tests show that a user cannot retrieve what they may not open.
RAG source readiness
How to decide which documents a retrieval assistant should use, who owns each source and how to find missing answers before anything is indexed.
Talk to an engineer
Bring one piece of work you would like to improve. The call takes 30 minutes and needs no access to your systems or your data.
Booking runs on Google Calendar.
Prefer to write first? Leave your email and a few lines, and we reply with times.
Look for the draft in your email program
Send it from there, and an engineer replies in person with times for a 30-minute call. If no draft has opened, write to us at miki@cloudsail.com.