BlogAI strategy

An LLM gateway pilot you can take down again

A gateway pilot gets approved when the people who must agree can see how it ends. Keep it to two use cases, run it in an environment that can be deleted as a whole, say in one page what is logged about whom, and write down before the start what would count as success. The promise that it can be removed tomorrow is often what gets you the yes, so make sure it is true. As of 27 November 2026.

By Updated

Why removable matters

The people you need are rarely against AI. They are short of time and wary of one more system that stays for ever. An infrastructure team that hears "new platform" thinks of on-call duty. A works council that hears "logs" thinks of monitoring. A pilot that can be deleted takes the weight out of both conversations.

  • A separate cloud subscription or a hosting provider, so nothing in production depends on the pilot
  • Its own hostname, which you can switch off or point elsewhere
  • A written list of what is deleted at the end: keys, logs, the database
  • A date on which someone decides whether it stays

Two use cases are enough

Pick one use case where people work with a tool and one where an application calls a model. A development team using a coding agent through the gateway is a good first. An internal assistant that already exists is a good second. Together they exercise personal keys, service account keys, budgets and logging, which is most of what a gateway does.

Leave the attractive ideas for later: self-service for every employee, agents that act in business systems, your own models. Each of them is a project of its own, and each brings a new group that has to agree.

Who needs to hear what

The groups that usually have to agree to a gateway pilot, and what answers their concern
GroupTheir concernWhat to bring
IT securityA new component that holds every provider keyWho patches it and how fast, what is reachable from where, how keys are rotated
Works councilLogs that show what a person didThe exact fields that are recorded, reports by team only, a pilot agreement with an end date
Data protectionPrompts leaving the company and being storedThe list of model endpoints, whether prompt content is logged, how long logs are kept
Infrastructure teamOperating one more systemThe separate environment, who runs it during the pilot, what a handover would include
Department headsCost and disruption for their peopleA budget cap per team and what their team gets out of it

The works council in Germany

In Germany a gateway that records requests per person will normally fall under co-determination. Law firms writing on this in 2026 agree on the core: it is enough that a system is objectively able to monitor behaviour or performance, and the employer's intention does not matter. The employer also has to inform the works council before AI is introduced. A Hamburg labour court decided differently in 2024 only because employees were using private accounts in their browser, which is the opposite of a company gateway.

Go to the works council before the pilot, with the one-page list of logged fields and an offer: a pilot agreement limited to named users and an end date, with reports by team only. This is our summary of published legal commentary and not legal advice. Have your employment lawyer read the agreement.

Criteria written down before the start

A pilot without criteria ends in opinions. Write the criteria into the document that everyone approved, so nobody argues about them afterwards. These are the ones we would use.

  • All model traffic of the pilot teams goes through the gateway, and their direct provider keys are revoked
  • Spend per team in the gateway matches the provider invoices closely enough for finance to accept it
  • A revoked key stops working, and a team that reaches its budget is stopped
  • One upgrade has been rolled out with tests, by your own people
  • A backup has been restored into a fresh environment
  • The pilot users would rather keep it than go back

After the pilot

On the agreed date there are three honest outcomes: keep it and move it in-house, extend it with a reason, or remove it. Removal is not a failure if you write down what you learned. If it stays, the handover is the real end of the pilot: configuration in your repository, a runbook your team has used at least once, a named owner and a regular slot for upgrades.

We offer gateway pilots on these terms, with the handover included.

Questions

Does the works council have to agree to a gateway pilot?

In Germany usually yes, as soon as the gateway records requests per person. Involve the works council before the start and offer a time-limited pilot agreement. Ask your employment lawyer for your specific case.

How many people should a gateway pilot include?

One or two teams. Enough to see real usage and a real invoice, few enough that you can talk to every user.

Should the pilot run on our production infrastructure?

Not at first. A separate subscription or a hosting provider is approved faster and can be deleted. Plan the move in-house for when the pilot has met its criteria.

Talk to an engineer

Bring one piece of work you would like to improve. The call takes 30 minutes and needs no access to your systems or your data.

Booking runs on Google Calendar.

Mickey Graf

Mickey Graf

Founder and CEO of Cloudsail

Rated 4.9 out of 5 on Clutch

Prefer to write first? Leave your email and a few lines. Mickey reads every message himself and replies by email with times for a call.

The button prepares an email in your own email program, for you to send. Privacy policy (draft)